Supervision of Graduate Studentsالإشراف على أبحاث
طلبة الدراسات العليا
|
No.
|
Supervisor
|
Title of Research
|
|
1.
|
M. E. Ghitany
|
Marshall-Olkin
extended Lindley distribution and its application,
September 2009
|
|
2.
|
Hossein M. Soroush
|
Bicriteria
Stochastic Sceduling,
Spring 2009-2010
|
|
3.
|
Lakdere Benkherouf
|
Optimal policies for a finite-time
production inventory systems with time-varying demand, MSc Thesis, Fall 2009
|
|
4.
|
Lakdere Benkherouf
|
(s,S) policies in discrete time inventory models, MSc Project,
Spring 2010
|
|
5.
|
Lakdere Benkherouf
|
1. On a finite-horizon two-warehouse
production inventory model, MSc Project,
2. Spring
2010
3.
|
|
6.
|
Mokhtar Hassan
Konsowa and Fahimah Al-Awadhi
|
Cover
Times and Commute Times of Random Walks on Random Trees,
Fall
2009
|
|
7.
|
Mokhtar Hassan
Konsowa and . Fahimah
Al-Awadhi
|
Random
walks on Connected Graphs,
Fall
2010/2011
|
|
8.
|
Mokhtar Hassan
Konsowa
|
4. Irregular Random walks on the Line of Nonnegative Integers,
5. Fall 2011/2010
6.
|
|
9.
|
Fahimah
Al-Awadhi
|
7. Bayesian
inference for change point problems, November 2009
8.
|
|
10.
|
Fahimah
Al-Awadhi
|
An investigation of
the behavioral intension of purchasing
non-deceptive counterfeit products in Kuwait, 2009
|
Participation
in Research Projects
|
|
P.I.
|
Funded Projects
|
|
1.
|
Reem Al-Jarallah
|
Genetic
Diseases in Kuwait:
A Statistical Approach.
Project
Period: 2009 - 2011
|
|
2.
|
Fatemah Al-Qalaf and Ahmad Reza
Soltani
|
Analysis of Sequences of Sample Principle
Components.
Project
Period: 2008 - 2009
|
|
3.
|
H. M. Soroush
|
Scheduling with Inserted Idle Time in a Stochastic
Single Machine System to Minimize the Sum of Quadratic Functions of Job
Lateness and Idle Time.
Project
Period: 2009 - 2010
|
|
4.
|
H. M. Soroush
and T. M. Al- Khamis
|
Bicriteria
Stochastic Sceduling in Stochastic Single Machine Systems.
Project
Period: 2009 - 2010
|
|
5.
|
S. Al-Yakoob and H.M. Soroush
|
A Vessel
Scheduling Transportation Problem: Determining Optimal
Locations/ Relocations for Transshipment Storage Facilities and the Consideration of Stochastic
Demand Structures.
Project
Period: 2007 - 2010
|
|
6
|
M. Konsowa
and
Fahimah Al-Awadhi
|
Speed of random walks on Graphs and Electric Networks.
Project
Period: 2010 - 2011
|
|
|